Home/Exhibits/Aerospace & Astronomy/Chinese shield tunneling machines

Chinese shield tunneling machines

The exhibits display miniature scale models of shield tunneling machines on the exhibit stand, allowing visitors to…

Chinese shield tunneling machines — Aerospace & Astronomy exhibit for science museums
Studio rendering
CategoryAerospace & Astronomy
TopicEngineering landmarks
Standard size5000 x 3500 x 4000 mm
SupplySingle unit or batch · OEM to your drawing
Lead timeStandard 4–8 weeks after deposit (confirmed per contract)
Warranty1 year, structure and control
DocumentsSpecification sheet · control diagram · spare-part list

A standard catalogue model: the dimensions, control package and finish are fixed, which is what keeps the price and the lead time predictable. Size, colour and interface language can be adapted without a new design cycle.

Ask about this model → Email us
01 / Overview

The exhibits display miniature scale models of shield tunneling machines on the exhibit stand, allowing visitors to understand the internal structure of shield tunneling machines, and to learn about the structural working principles of shield tunneling machines and the development process of domestically produced shield tunneling machines in China by operating touch screens.

02 / How visitors use it

The unit is designed for unsupervised public use: controls are recessed or shielded, moving parts are enclosed, and the interface is operable by a child of about six with no instruction. Where a screen is used, the language can be switched without changing the hardware, and the content can be replaced on site.

03 / The science behind it

When the Qing Dynasty fell in 1912, China's railway mileage was only 9000 kilometers, and most of it was still in the hands of foreigners. For the weak Nationalist government and displaced Chinese people at that time, this was not a dream that could be criticized, but a vague fantasy! Nowadays, China has 139000 kilometers of railways, 6730 kilometers of urban rail transit, and 5.01 million kilometers of highways, including over 18000 kilometers of railway tunnels; Highway tunnels exceeding 20000 kilometers; The subway is 6000 kilometers long.

04 / Built for a public floor

Every unit leaves the factory after a running test: mechanisms cycled, electronics burned in, edges dressed, fixings torqued and marked. Wear parts — bearings, sliders, lamps, belts, touch panels — are modular and listed on the spare-part sheet, so a venue technician can replace them without returning the exhibit. Crating is plywood with foam blocking; the loading plan and packing list travel with the shipment.

Same category

More in Aerospace & Astronomy

Other models from the Aerospace & Astronomy line, all held to the same specification and the same control package.

Start a project

Send us your exhibit list.
We will come back with a price.

Attach a theme outline, a floor plan, or nothing at all — a photo of the space is enough to start. Quotations are issued against a real exhibit list, not per-square-metre guesses.

WeChat QR code — scan to message us Scan to add us
on WeChat