Home/Exhibits/Earth & Ecology/Fossil Dig Site

Fossil Dig Site

Buried replicas and brushes; visitors excavate, record and label.

Fossil Dig Site — Earth & Ecology exhibit for science museums
Model FOSSIL-DIGStudio rendering
CategoryEarth & Ecology
Model code—
Standard sizeCustom size
SupplySingle unit or batch · OEM to your drawing
Lead timeStandard 4–8 weeks after deposit (confirmed per contract)
Warranty2 years, structure and control
DocumentsSpecification sheet · control diagram · spare-part list

A standard catalogue model: the drawing, control package and finish are fixed, which is what keeps the price and the lead time predictable. Size, colour and interface language can be adapted without a new design cycle.

Ask about this model → Email us
01 / Overview

Fossil Discovery Park simulates the real process of fossil excavation. By burying fossil specimen models in sandy soil or simulated rock layers, viewers can experience the joy of archaeologists excavating fossils. 1. Obtain mining tools. 2. Enter the exploration paradise and search for "fossils". The types of fossils include: solid fossils: fossils formed by the preservation of all or part of the remains of organisms through petrification, such as the mandible fossils of South China tigers. Fossil casting: Refers to the impressions and molds left by biological remains in rock layers, such as molds formed from leaves. Fossil remains: Traces and relics left by ancient biological activities preserved in rock layers, such as footprints and feces. Chemical fossil: A special fossil formed by the decomposition and conversion of organic components of organisms into organic compounds such as amino acids and fatty acids under specific conditions. Some of these chemical fossils can form important mineral resources such as coal, oil, and natural gas.

02 / How visitors use it

The unit is designed for unsupervised public use: controls are recessed or shielded, moving parts are enclosed, and the interface is operable by a child of about six with no instruction. Where a screen is used, the language can be switched without changing the hardware, and the content can be replaced on site.

03 / Built for a public floor

Every unit leaves the factory after a running test: mechanisms cycled, electronics burned in, edges dressed, fixings torqued and marked. Wear parts — bearings, sliders, lamps, belts, touch panels — are modular and listed on the spare-part sheet, so a venue technician can replace them without returning the exhibit. Crating is plywood with foam blocking; the loading plan and packing list travel with the shipment.

Same category

More in Earth & Ecology

Other models from the Earth & Ecology line, all held to the same drawing and the same control package.

Start a project

Send us your exhibit list.
We will come back with drawings and a price.

Attach a theme outline, a floor plan, or nothing at all — a photo of the space is enough to start. Quotations are issued against real drawings, not per-square-metre guesses.