Home/Exhibits/Frontier Technology/Industrial energy refinement

Industrial energy refinement

70% of China's industrial energy consumption is concentrated in industrial parks, with high electricity consumption…

Industrial energy refinement — Frontier Technology exhibit for science museums
Reference image
CategoryFrontier Technology
Standard sizeCustom size
SupplySingle unit or batch · OEM to your drawing
Lead timeStandard 4–8 weeks after deposit (confirmed per contract)
Warranty1 year, structure and control
DocumentsSpecification sheet · control diagram · spare-part list

A standard catalogue model: the dimensions, control package and finish are fixed, which is what keeps the price and the lead time predictable. Size, colour and interface language can be adapted without a new design cycle.

Ask about this model → Email us
01 / Overview

70% of China's industrial energy consumption is concentrated in industrial parks, with high electricity consumption and diversified energy consumption methods for users, resulting in a large demand for energy such as cooling, heating, and power. The construction of virtual power plants can provide flexible energy supply and demand management. By comprehensively utilizing various regulatory resources and combining them with smart grids, intelligent scheduling and management can be achieved, promoting the balance of power supply and demand, improving the stability and reliability of the power system, ensuring normal production of enterprises, and meeting the needs of high-speed economic growth in the park.

02 / How visitors use it

The unit is designed for unsupervised public use: controls are recessed or shielded, moving parts are enclosed, and the interface is operable by a child of about six with no instruction. Where a screen is used, the language can be switched without changing the hardware, and the content can be replaced on site.

03 / The science behind it

Improving the peak valley time of use electricity price and implementing peak electricity price policies aim to guide users to use electricity off peak, cut peak and fill valley, ensure the power supply in Shenzhen, promote the construction of a new energy based power system, effectively ensure the safe, stable and economic operation of the power system, and help Shenzhen achieve its "dual carbon" goals as soon as possible. For example, after joining the virtual power plant response, the factory adjusts the production schedule and arranges production tasks with low power consumption to the 'peak shaving' period, and those with high power consumption to the 'valley filling' period. This not only minimizes the impact on production to the greatest extent possible, but also provides tangible rewards.

04 / Built for a public floor

Every unit leaves the factory after a running test: mechanisms cycled, electronics burned in, edges dressed, fixings torqued and marked. Wear parts — bearings, sliders, lamps, belts, touch panels — are modular and listed on the spare-part sheet, so a venue technician can replace them without returning the exhibit. Crating is plywood with foam blocking; the loading plan and packing list travel with the shipment.

Same category

More in Frontier Technology

Other models from the Frontier Technology line, all held to the same specification and the same control package.

Start a project

Send us your exhibit list.
We will come back with a price.

Attach a theme outline, a floor plan, or nothing at all — a photo of the space is enough to start. Quotations are issued against a real exhibit list, not per-square-metre guesses.

WeChat QR code — scan to message us Scan to add us
on WeChat