At present, over 90% of cross-border data transmission worldwide is carried out by submarine cables, which have…
| Category | Frontier Technology |
|---|---|
| Standard size | Custom size |
| Supply | Single unit or batch · OEM to your drawing |
| Lead time | Standard 4–8 weeks after deposit (confirmed per contract) |
| Warranty | 1 year, structure and control |
| Documents | Specification sheet · control diagram · spare-part list |
A standard catalogue model: the dimensions, control package and finish are fixed, which is what keeps the price and the lead time predictable. Size, colour and interface language can be adapted without a new design cycle.
Standard models from this range are also listed in our online store, priced in USD — see the price yourself ↗
At present, over 90% of cross-border data transmission worldwide is carried out by submarine cables, which have become a dense network that extends in all directions and an indispensable component of world prosperity and economic development. The world is closely connected, promoting global exchange and integration of information, culture, and economy.
The unit is designed for unsupervised public use: controls are recessed or shielded, moving parts are enclosed, and the interface is operable by a child of about six with no instruction. Where a screen is used, the language can be switched without changing the hardware, and the content can be replaced on site.
In 1850, the French Anglo Telegraph Company laid the first submarine cable in human history across the English Channel between England and France, which could only send Morse telegraph codes at that time. Today, the research and development, production, and laying of submarine cables have a history of nearly 200 years, and their functions have undergone significant changes, becoming an important means of contemporary international communication. From the global distribution map of submarine cables, the laying density is very high, with numerous cables stretching across the vast and deep seabed, shuttling between the plains, canyons, and mountains of the seabed, like a giant network connecting the world. The landing location at both ends of the submarine cable is called the cable landing point. In addition to Hong Kong, Macao and Taiwan, the main Internet access in mainland China used to be only Shanghai, Qingdao and Shantou. After construction, Fuzhou, Xiamen and Hainan Island have been added. Some of these submarine cables connect neighboring countries at sea such as Japan, South Korea, Malaysia, and the Philippines, while others cross over.
Every unit leaves the factory after a running test: mechanisms cycled, electronics burned in, edges dressed, fixings torqued and marked. Wear parts — bearings, sliders, lamps, belts, touch panels — are modular and listed on the spare-part sheet, so a venue technician can replace them without returning the exhibit. Crating is plywood with foam blocking; the loading plan and packing list travel with the shipment.
Other models from the Frontier Technology line, all held to the same specification and the same control package.

Build a span from interchangeable parts and load it until it fails.

Shape-memory alloy, aerogel and carbon fibre under the visitor's hand.

Build a lattice from magnetic balls and see why a crystal cleaves.

Four arms perform a synchronised routine behind a glass wall.
Attach a theme outline, a floor plan, or nothing at all — a photo of the space is enough to start. Quotations are issued against a real exhibit list, not per-square-metre guesses.
Scan to add us