The Dengfeng Observatory is the earliest existing astronomical observatory in China, built by astronomer Guo…
| Category | Basic Science |
|---|---|
| Standard size | Custom size |
| Supply | Single unit or batch · OEM to your drawing |
| Lead time | Standard 4–8 weeks after deposit (confirmed per contract) |
| Warranty | 1 year, structure and control |
| Documents | Specification sheet · control diagram · spare-part list |
A standard catalogue model: the dimensions, control package and finish are fixed, which is what keeps the price and the lead time predictable. Size, colour and interface language can be adapted without a new design cycle.
Standard models from this range are also listed in our online store, priced in USD — see the price yourself ↗
The Dengfeng Observatory is the earliest existing astronomical observatory in China, built by astronomer Guo Shoujing in 1276 AD. The stargazing platform consists of two parts: a platform surrounded by a spiral path and a stone archway laid from the groove on the north wall of the platform to the north. The platform is in the shape of a square covered bucket, and the four walls are made of water milled bricks. The stone ruler on the Taipei side of the stargazer is used to measure the length of the shadow of the sun, so it is also known as the "measuring ruler". Due to its unique design, it became a historical witness to the highly developed astronomy of the Yuan Dynasty. The stargazing platform itself is a giant gnomon, which is an improvement of traditional pole based shadow measurement by Guo Shoujing. He creatively invented the "scenery symbol", which solved the problem of "high shadow illusion" during measurement and avoided the influence of the so-called half shadow of sunlight in physics. Thus, the precise timing of the twenty-four solar terms, especially the winter solstice and summer solstice, was determined.
The unit is designed for unsupervised public use: controls are recessed or shielded, moving parts are enclosed, and the interface is operable by a child of about six with no instruction. Where a screen is used, the language can be switched without changing the hardware, and the content can be replaced on site.
Every unit leaves the factory after a running test: mechanisms cycled, electronics burned in, edges dressed, fixings torqued and marked. Wear parts — bearings, sliders, lamps, belts, touch panels — are modular and listed on the spare-part sheet, so a venue technician can replace them without returning the exhibit. Crating is plywood with foam blocking; the loading plan and packing list travel with the shipment.
Other models from the Basic Science line, all held to the same specification and the same control package.

Rotate two polarising filters and watch colours appear and vanish.

Sand on a driven plate jumps into nodal figures as the frequency changes.

Coloured discs drain to grey as the spin speed passes the eye's limit.

Gas discharge tubes and a slit spectroscope show emission lines directly.
Attach a theme outline, a floor plan, or nothing at all — a photo of the space is enough to start. Quotations are issued against a real exhibit list, not per-square-metre guesses.
Scan to add us