This unit includes two exhibits: "The Establishment and Development of the Overall National Security Concept" and…
| Category | Safety & Emergency |
|---|---|
| Standard size | Custom size |
| Supply | Single unit or batch · OEM to your drawing |
| Lead time | Standard 4–8 weeks after deposit (confirmed per contract) |
| Warranty | 1 year, structure and control |
| Documents | Specification sheet · control diagram · spare-part list |
A standard catalogue model: the dimensions, control package and finish are fixed, which is what keeps the price and the lead time predictable. Size, colour and interface language can be adapted without a new design cycle.
Standard models from this range are also listed in our online store, priced in USD — see the price yourself ↗
This unit includes two exhibits: "The Establishment and Development of the Overall National Security Concept" and "The Connotation and Essence of the Overall National Security Concept". The establishment and development of the overall national security concept "showcases the development process of the overall national security concept since its first proposal on April 15, 2014, through an automatic display of the opening and closing screens. The connotation and essence of the overall national security concept is displayed in various forms such as sculpture walls, multimedia, and spatial art installations. The sculpture wall presents the "five elements" and "five overall plans" of the overall national security concept; Viewers can interact with the "Xiao An" on the big screen, click to play videos, and learn about 20 areas of national security; The core essence of the overall national security concept displayed on the wall is the "Ten Adherences"; At the top of this space, there is a national security themed art installation. When viewed from different angles, the same installation will display the words "National Security" and "The Foundation of Revitalization".
The unit is designed for unsupervised public use: controls are recessed or shielded, moving parts are enclosed, and the interface is operable by a child of about six with no instruction. Where a screen is used, the language can be switched without changing the hardware, and the content can be replaced on site.
Every unit leaves the factory after a running test: mechanisms cycled, electronics burned in, edges dressed, fixings torqued and marked. Wear parts — bearings, sliders, lamps, belts, touch panels — are modular and listed on the spare-part sheet, so a venue technician can replace them without returning the exhibit. Crating is plywood with foam blocking; the loading plan and packing list travel with the shipment.
Other models from the Safety & Emergency line, all held to the same specification and the same control package.

Four alert levels mapped to the response action each one requires.

A domestic room with eleven faults to find and fix.

Build a frame on a shake table and test it to failure.

Match forty signs to their meaning against a timer.
Attach a theme outline, a floor plan, or nothing at all — a photo of the space is enough to start. Quotations are issued against a real exhibit list, not per-square-metre guesses.
Scan to add us