The "Fuxing" is a Chinese standard EMU train developed under the leadership of China Railway Corporation.
| Category | Technology & Everyday Life |
|---|---|
| Interaction | Hands-on, visitor-operated exhibit |
| Standard size | Built to your floor plan |
| Power | 100–240 V AC, 50/60 Hz, single phase — universal input; no step-down transformer or motor re-tap |
| Supply | Single unit or batch · OEM to your drawing |
| Lead time | Standard 3–6 weeks after deposit (confirmed per contract) |
| Warranty | 1 year, structure and control |
| Documents | Specification sheet · control diagram · spare-part list |
A standard catalogue model: the dimensions, control package and finish are fixed, which is what keeps the price and the lead time predictable. Size, colour and interface language can be adapted without a new design cycle.
Standard models from this range are also listed in our online store, priced in USD — see the price yourself ↗
The "Fuxing" is a Chinese standard EMU train developed under the leadership of China Railway Corporation. It features completely independent intellectual property rights and has reached a world-class level. It is currently the world's fastest high-speed train in operation, with an average speed of 350 kilometers per hour. From the "Harmony" to the "Fuxing", China's high-speed trains have gone through four stages: "introduction-assimilation-re-innovation-continuous innovation", witnessing breakthroughs in core technologies and the establishment of Chinese standards, one by one. From nothing to something, from weak to strong, from introducing foreign technology to going global, the Chinese people have time and again gone from playing catch-up to taking the lead, allowing the world to witness "China Speed.". It is built for unsupervised public use: surfaces are robust and wipe-clean, there are no loose parts, and the interface works without instruction, so a child of about six can operate it on a busy floor.
Interaction type: Hands-on, visitor-operated exhibit. The unit is designed for unsupervised public use: controls are recessed or shielded, moving parts are enclosed, and the interface is operable by a child of about six with no instruction. Where a screen is used, the language can be switched without changing the hardware, and the content can be replaced on site.
Every unit leaves the factory after a running test: mechanisms cycled, electronics burned in, edges dressed, fixings torqued and marked. Wear parts — bearings, sliders, lamps, belts, touch panels — are modular and listed on the spare-part sheet, so a venue technician can replace them without returning the exhibit. Crating is plywood with foam blocking; the loading plan and packing list travel with the shipment.
Other models from the Technology & Everyday Life line, all held to the same specification and the same control package.

A fixed-base cockpit with a city route and a reaction-time score.

Tilt the nozzle and watch the thrust vector swing.

Angle the panel, watch the current and race the model.

Forty movements from water clock to quartz all reading the same second.
Attach a theme outline, a floor plan, or nothing at all — a photo of the space is enough to start. Quotations are issued against a real exhibit list, not per-square-metre guesses.
Prefer to see the floor before you commit? Factory visits and third-party inspections are welcome.