A gantry crane is a variant of a bridge crane, also known as a portal crane.
| Category | City & Society |
|---|---|
| Interaction | Scale model + multimedia |
| Standard size | Built to your floor plan |
| Power | 100–240 V AC, 50/60 Hz, single phase — universal input; no step-down transformer or motor re-tap |
| Supply | Single unit or batch · OEM to your drawing |
| Lead time | Standard 3–6 weeks after deposit (confirmed per contract) |
| Warranty | 1 year, structure and control |
| Documents | Specification sheet · control diagram · spare-part list |
A standard catalogue model: the dimensions, control package and finish are fixed, which is what keeps the price and the lead time predictable. Size, colour and interface language can be adapted without a new design cycle.
Standard models from this range are also listed in our online store, priced in USD — see the price yourself ↗
A gantry crane is a variant of a bridge crane, also known as a portal crane. Its metal structure resembles a gantry frame, with two legs installed under the load-bearing main girder. It can travel directly on ground-level tracks, and the ends of the main girder can be equipped with cantilevered outriggers. It is mainly used for loading and unloading operations in outdoor freight yards, material yards, and bulk cargo yards. Gantry cranes are widely used in port container yards due to their high space utilization, large operating range, broad adaptability, and strong versatility. This exhibit allows visitors to experience the loading and unloading operations of a gantry crane through an interactive game. Visitors sit in the seat and use the control mechanism to operate the container, including gripping, moving, and lowering it. They interact with the screen to experience the structure and workflow of a gantry crane used for loading and unloading cargo from container ships. Improper operation of gantry cranes can not only cause economic losses but also pose significant risks. The "Ten No-Lifting" rules must be strictly enforced: 1. Do not lift if the command signal is unclear or there are conflicting commands; 2. Do not lift loads exceeding the rated lifting capacity; 3. Do not lift if the lifting gear is used improperly or the load is not securely fastened; 4. Do not lift if there are people on the load or other loose objects; 5. Do not lift if the holding brake or other braking safety devices are malfunctioning; 6. Do not lift if the suspended load is being directly processed; 7. Do not lift if the load is being pulled at an angle or suspended obliquely; 8. Do not lift explosive objects; 9. Do not lift objects buried underground; 10. Do not lift objects with sharp edges or protrusions without proper padding. It is built for unsupervised public use: surfaces are robust and wipe-clean, there are no loose parts, and the interface works without instruction, so a child of about six can operate it on a busy floor.
Interaction type: Scale model + multimedia. The unit is designed for unsupervised public use: controls are recessed or shielded, moving parts are enclosed, and the interface is operable by a child of about six with no instruction. Where a screen is used, the language can be switched without changing the hardware, and the content can be replaced on site.
Every unit leaves the factory after a running test: mechanisms cycled, electronics burned in, edges dressed, fixings torqued and marked. Wear parts — bearings, sliders, lamps, belts, touch panels — are modular and listed on the spare-part sheet, so a venue technician can replace them without returning the exhibit. Crating is plywood with foam blocking; the loading plan and packing list travel with the shipment.
Other models from the City & Society line, all held to the same specification and the same control package.

Blade pitch adjusted by hand with thrust read on a live gauge.

Time four signals so a bus crosses the city without stopping.

Load a hull until it floats and then until it does not.

Road-side sensing, lane markings and vehicle communication in one model.
Attach a theme outline, a floor plan, or nothing at all — a photo of the space is enough to start. Quotations are issued against a real exhibit list, not per-square-metre guesses.
Prefer to see the floor before you commit? Factory visits and third-party inspections are welcome.